Name _________________________ Date
___________
Instructions: Circle the correct response.
1.
If you assign the
value 42 to cell E5, the value 11 to cell F5, and cell G5 contains the function
=IF(E5>4*F5,“Deductions”,“No deductions”), then cell G5 displays the message, ____________ is the process of constructing
programs and code modules that are building blocks of an information system. .
a. Hardware developmentDeductions
b. Application developmentNo deductions
c. Software Engineering#REF!
d. ODBC F5
2.
Use Athe ____________
functioncommand? when the value you want to assign to a cell is
dependent on a logical teconsists of related program code
organized into small units that are easy to understand and maintain. st.
a. moduleASSIGNssign
b. consoleIFf_THENhen_ELSElse
c. data couple WHAT IFhat_If
d. controlIFIf
3.
In structure charts, a higher-level module called a ____________ directs
lower-level modules called a ____________. A cell
reference of $B17 is a(n) ____________ cell
reference.
a. data couple, storage coupleabsolute
b. data couple, library modulerelative
c. control module, subordinate modulemixed
d. top-down module, partitioning moduleinvalid
4.
In structure charts, a curved arrow
represents a You can use the Split command to split a window into ____________. .
a. decisionhorizontal
panes
b. librarytwo vertical panes
c. messagefour panes
d. loopof the
above
5.
Modules that are independent are considered to be ____________ coupled..
a. looselyQtr 5, Qtr 6, Qtr 7
b. tightlyQtr 1, Qtr 2, Qtr 3
c. partitionQtr 3, Qtr 3, Qtr 1
d. loop#REF!
6.
The testing of an individual program or module is called When copying a range of cells using the drag and drop
method, you first point to the border of the selected range so that the mouse
pointer changes to a (n) ____________.
a. system testingcross hair
b. integration testingarrow
c. unit testingblock plus sign
d. desk checkingsplit double arrow
7.
The environment that analysts and programmers use to
develop and maintain programs is called theo
freeze worksheet titles use the ___________ command
on the ___________ me
environment. nu.
a. operationalSplit, Format
b. analystSplit, Window
c. managementFreeze Panes, Window
d. testFreeze Panes, Tools
8.
Using a ___________ strategy to train users, you can select
knowledgeable users who then conduct sessions for others. o indicate
when there is a cell reference error.
a. train-the-trainer######
b. classroom******
c. operational#REF!
d. errtutorialor
9.
TheYou
can use the Shadow button on the ____________ approach for a system
changeover causes the new system to be used immediately as soon as it becomes
operationaltoolbar to add a drop shadow to a .
a. parallel operationStandard
b. direct cutoverDrawing
c. smooth cutoverFormatting
d. pilot operationChart
10.
The ____________
changeover method requires that both the old and the new information systems
operate fully for a specified period.
a.
direct rmat Data
Series
b. lateral 3-D View
c. parallel operationFormat 3-D Pie Group
d. horizontal operation
Systems Analysis & Design Chapter 9 – True/False
Instructions: Circle T if the statement is true or F
if the statement is false.
T |
F |
1. In the systems implementations phase,
the system design specification serves as a blueprint for constructing the
new system. |
T |
F |
2. In a top-down
program design, the overall objectives are defined and broken down into
modules. |
T |
F |
3. In a structure
chart, an arrow with an empty circle is called a pointer control. |
T |
F |
4. A module that
performs many tasks and functions has a high degree of cohesion. |
T |
F |
5. Pseudocode is the
process of turning program logic into specific instructions that a computer
system can execute. |
T |
F |
6. It is
recommended to consider a training plan after a system has been installed and
tested. |
T |
F |
7. ODBC is an
industry-standard protocol that allows DBMSs from
various vendors to interact and exchange data. |
T |
F |
8. System
changeover is the process of putting a new information system online and
retiring the old one. |
T |
F |
9. The phased
operation changeover method involves implementing the complete new system at
a selected location of a company. |
T |
F |
10. A post-implementation evaluation
assesses the overall quality of the information system, and verifies that it
meets the specified requirements. |
Chart Type