Name _________________________ Date
___________
System Analysis & DesignExcel 2002
Project
Chapter 53
–
- Multiple Choice
Instructions: Circle the correct response.
1. AIf you assign
the value 42 to cell E5, the value 11 to cell F5, and cell G5 contains the
function =IF(E5>4*F5,“Deductions”,“No deductions”), then cell G5 displays
the message, ____________ model uses a
set fee based on a specific level of service and user support.
a. usageDeductions
b. fixed feeNo deductions
c. standard#REF!
d. subscriptionF5
2. A software package that can be
used by many different types of organizations is called aUse the
____________ functioncommand? when the
value you want to assign to a cell is dependent on a logical
test.
a. standard applicationASSIGNssign
b. vertical
applicationIFf_THENhen_ELSElse
c. horizontal
applicationWHAT IFhat_If
d. VAR
applicationIFIf
3. Which of the following is not a reason for
purchasing a Software PackageA cell reference of
$B17 is a(n) ____________
cell reference?.
a. Meet
constraints of existing technologyabsolute
b. Lower
costsrelative
c. Require
less time to implementmixed
d. Future
upgrades provided by the vendorinvalid
4. A file that can be viewed, but
not changed is said to have You can use the
Split command to split a window into ____________ properties.
a. hiddentwo horizontal panes
b. read-writetwo vertical panes
c. write-onlyfour panes
d. read-onlyall of the above
5. A If cell E8 contains
the label, Qtr 4, and you select cell E8 and then drag the fill handle to the
left, then cells D8, C8, and B8 will contain the labels ____________ determines
how long it takes an information system to pay for itself through reduced costs
and increased benefits.
a. net present valueQtr 5, Qtr 6, Qtr 7
b. return on investmentQtr 1, Qtr
2, Qtr 3
c. payback analysisQtr 3, Qtr 3, Qtr 1
d. #REF!
6. A logical design When copying a range of cells using the drag and drop
method, you first point to the border of the selected range so that the mouse
pointer changes to a (n) ____________defines the
functions and features of the system, relationships among components, and ____________ .
a. what must take placecross hair
b. how it is to be accomplishedarrow
c. when it is to be finishedblock plus
sign
d. all of the abovesplit double arrow
7. An early, rapidly constructed
working version of a proposed information system is called To freeze a(n) worksheet
titles use the ___________ command on the ___________ menu.
a. ROI systemSplit, Format
b. prototype Split,
Window
c. RFQFreeze Panes, Window
d. 4GLFreeze Panes, Tools
8. Excel displays the
error message ____________ to
is a
modeling tool that uses various symbols to identify input and output
operations, represent data, and show mediaindicate when there is a cell
reference error.
a. 4GL######
b. ANSI******
c. A CaseCASE tool#REF!
d. A systems
flowcharterror
9. You can use the
Shadow button on the ____________ toolbar to add a drop shadow to are numbers
or letters that are assigned in a specific order cell.
a. Order codesStandard
b. Block codesDrawing
c. Sequence codesFormatting
d. Action codesChart
10. Which of the
following is not a rule to be used when developing a codeTo change the
elevation of a selected pie chart, click ____________ on the Chart
menu?.
a. a. Keep codes conciseFormat Data Series
b. Make codes cryptic3-D View
c. Use sortable codesFormat 3-D Pie Group
d. Make codes unique
Instructions: Circle T if
the statement is true or F if the statement is false.
T |
F |
1. A
Web-based application builds the application code into the Web. |
T |
F |
2. In a Web-based systems development environment, system
design is influenced by compatibility issues, including existing hardware and
software platforms. |
T |
F |
3. A fixed fee model for outsourcing uses a set fee based on
a specified level of service and user support. |
T |
F |
4. A key reason for In-House system development is that it
requires less technical development staff. |
T |
F |
5. The net present value (NPV) of a project is the total
value of benefits minus the total value of costs, both adjusted to reflect
the point in time at which they occur. |
T |
F |
6. The goal of systems design is to build a system that is
effective, reliable, and maintainable. |
T |
F |
7. In a parameter query, a parameter is a hard-coded value
that the user cannot modify. |
T |
F |
8. A default value is a value that is automatically
displayed by the system, and can be accepted or modified by the user. |
T |
F |
9. In Modular Design, you create individual processing
components, called modules, which connect to a higher-level program or
process. |
T |
F |
10.
Self-checking codes distinguish items by using a series of subgroups of
digits. |
Chart Type