Name _________________________ Date
___________
Systems
Analysis & Design Excel 2002 ProjectChapter
323
–
- Multiple Choice
Instructions: Circle the correct response.
1. Which of the following activities areis not includeds
in the systems analysis phase?If you assign the
value 42 to cell E5, the value 11 to cell F5, and cell G5 contains the function
=IF(E5>4*F5,“Deductions”,“No deductions”), then cell G5 displays the message, ____________ planning is the process of identifying long-term organizational goals,
strategies, and resources.
a. FeasibilityDeductions
b. Requirements ModelingStrategicNo deductions
c. Development StrategiesSystems#REF!
d. ITF5
2. The systems analysis
skill that will enable you to identify a problem, evaluate the key elements,
and develop a useful solution is calledIn a SWOT analysis, the S stands for
Use the ____________ skills functioncommand? when the value you want to assign to a cell is
dependent on a logical test.
a. sSystem ystemASSIGNssign
b. interpersonalSoftwareIFf_THENhen_ELSElse
c. analyticalStrength WHAT IFhat_If
d. enterpriseStudyIFIf
3. TheIn A SWOT analysis, the O stands forA
cell reference of $B17 is a(n) ____________ phase using
the RAD technique ends when the team agrees on key issues and obtains
authorization to continue cell
reference.
a. User DesignObjectabsolute
b. ConstructionOperationrelative
c. Requirements
PlanningObjectionsmixed
d. CutoverOpportuniesinvalid
4. During the Stakeholders____________ phase using
the RAD technique, users interact with systems analysts and develop models and
prototypes that represent all systems
processes, outputs, and inputs. in a company are which of the following? You can use the
Split command to split a window into ____________.
a. InputCommunitytwo horizontal panes
b. OutputSupplierstwo vertical
panes
c. ConstructionEmployeesfour panes
d. User Designall of the
above of the above
5. AThe starting point for a project
is called a(n)If cell E8
contains the label, Qtr 4, and you select cell E8 and then drag the fill handle
to the left, then cells D8, C8, and B8 will contain the labels ____________ diagram visually represents
the interaction between users and the information system.
a. use casesystems
requestQtr 5, Qtr 6, Qtr 7
b. CASEfeasibility
studyQtr 1, Qtr 2, Qtr 3
c. FDDkey
performance indicatorQtr 3, Qtr 3, Qtr 1
d. UMLproject
definition#REF!
6.
A(n)The coding of data to keep it safe from
unauthorized users is called ___________ diagram
shows the timing of transactions between objects as they occur.
a. locking
b. interlockinghiding
c. sequenceshading
d. TCOencryption
7.
WIn a(n)
___________ hich structure,
some people have more influence or knowledge than appears on an organizational
chartof the following is
not an external factor that will affect a projecten copying a
range of cells using the drag and drop method, you first point to the border of
the selected range so that the mouse pointer changes to a (n) ____________.
a. Zachman FrameworkCustomerscross hair
b. informalExisting
Systemsarrow
c. Economyblock plus
sign
d. formalTechnologysplit double
arrow
To freeze worksheet titles use the ___________ command
on the ___________ menu.
a. Split, Format
b. Split, Window
c. Freeze Panes, Window
d. Freeze Panes, Tools
8. In an interview, Excel displays
the error message ____________
tfeasibility questions
encourage spontaneous and unstructured responsesmeans that a proposed system will be used
effectively after it has been developedo indicate
when there is a cell reference error.
a. Open-endedrational######
b. Closed-endedTechnical******
c. Range-of-responseEconomic#REF!
d. FeasibilityPreliminaryerror
9. A You can use the
Shadow button on the ____________
is a
document containing a number of standard
questions that can be sent to many individualscan be measured in dollarstoolbar to add a drop shadow to a cell.
a. Tangible Bbenefits Diagram efitsStandard
b. Zachman DiagramIntangible
benefitsDrawing
c. Projected salesFormatting
d. sFuture growthurveyChart
10. To To ensure that a sample is
balanced geographically, use a change the
elevation of a selected pie chart, click ____________ feasibility means that the projected
benefits of a proposed system outweigh the
estimated costson the Chart menu.
a. systematic sampleOperational Format Data
Series
b. stratified
sampleTechnical3-D View
c. random sampleEconomicFormat 3-D
Pie Group
d. acute sample
Systems Analysis &
Design Chapter 3 – True/False
Instructions: Circle T if
the statement is true or F if the statement is false.
T |
F |
1. The
deliverable, or end product of the systems analysis phase is a working
prototype that is ready for testing. |
T |
F |
2. JAD is a popular fact-finding technique that brings users
into the development process as active participants. |
T |
F |
3. The JAD approach is a relatively inexpensive approach,
and easily handles large groups, even for small projects. |
T |
F |
4. The construction phase using a RAD technique focuses on
program and application development. |
T |
F |
5. One disadvantage to RAD is that it stresses the mechanics
of the system itself, and does not emphasize a company’s strategic business
needs. |
T |
F |
6. The primary advantage to RAD is that systems can be
developed more quickly with significant cost savings. |
T |
F |
7. A functional decomposition diagram is a time based
representation of a business process. |
T |
F |
8. Both direct and indirect costs contribute to the Total
Cost of Ownership (TCO). |
T |
F |
9. When performing an interview, it is best to ask leading
questions to help the person feel more comfortable, and make the interview
flow better. |
T |
F |
10. The
process of listening to verbal communications and noticing nonverbal
communications during an interview is called engaged listening. |
DiscretionaryC
hart Type